Custom plastic manufacturing & precision tooling

Global support · Fast response · OEM focused

Core Service

Products Assembly

Contract product assembly covering OEM and ODM product development, mold manufacturing, plastic and die cast parts, PCB boards, component assembly, soldering, testing, packing and delivery — start to finish, from one factory in Dongguan.

OEM & ODM products

PCB soldering & testing

Ultrasonic & heat welding

Why Assemble With Us

The parts are already here. So is the team that made them.

China is the world's largest manufacturing country, with over 30 % of the world's electronic products assembled here before shipping onward. That scale means strong quality control, fast lead times and readily available components — real time and cost savings for your product.

Because we mold, cast, machine and finish the parts ourselves, assembly is not a hand-off to another supplier. Our team brings an 18-year technical background and fluent English to confirm every detail of your assembly before it starts — preventing issues rather than reacting to them later.

Assembly Methods

How we join plastic, metal and electronic parts.

01

Ultrasonic Welding

High-frequency vibration fuses plastic parts quickly with a strong, clean joint.

02

Heat & Solvent Welding

Controlled heat or solvent bonds compatible plastics into a permanent joint.

03

PCB Soldering

Precise soldering attaches components to circuit boards, tested before final assembly.

04

Fastening & Snap-Fit

Screws, clips and inserts where disassembly is needed; hook features where it is not.

Why Choose Us

Communication and control that gets projects done right.

01

18+ Years of Experience

Deep technical background in plastic and metal fields, fluent English communication and disciplined project management.

02

Illustrated DFM Review

Every potential issue reviewed up front with illustrated design-for-manufacturing solutions to reduce mistakes and misunderstandings.

03

In-House Control

Part design, prototyping, mold making, PCB testing, assembly and packing mostly done in-house — up to two weeks faster on urgent builds.

04

Tested Before It Ships

Drop, salt spray and high/low temperature tests on the assembled product, plus CE, FCC, ETL and RoHS certification support.

Clear Communication

The biggest hurdles for overseas businesses working with Chinese factories are finding an accountable partner and communicating clearly. Our engineers confirm every requirement in writing before assembly starts, so nothing is lost in translation.

Scroll to Top